Resource Type

Journal Article 374

Conference Videos 18

Year

2023 32

2022 37

2021 42

2020 29

2019 25

2018 21

2017 24

2016 15

2015 22

2014 13

2013 18

2012 12

2011 10

2010 12

2009 8

2008 10

2007 9

2006 11

2005 4

2004 2

open ︾

Keywords

planning 16

artificial intelligence 4

path planning 4

Antenna-in-package (AiP) 3

Trajectory planning 3

mobile robot 3

sustainable development 3

2035 2

Autonomous driving 2

CAPP 2

CO2 capture 2

COVID-19 2

Decision making 2

Decision network 2

Internet of Things 2

Motion planning 2

Route planning 2

Shanghai Port 2

decision-making 2

open ︾

Search scope:

排序: Display mode:

Enterprise-wide optimization of integrated planning and scheduling for refinery-petrochemical complex

Frontiers of Chemical Science and Engineering 2023, Volume 17, Issue 10,   Pages 1516-1532 doi: 10.1007/s11705-022-2283-7

Abstract: This paper focuses on the integrated problem of long-term planning and short-term scheduling in a large-scaleDifferent time scales are incorporated from the planning and scheduling subproblems.Discrete time representation is applied to the planning subproblem, while continuous time is appliedresults do not only illustrate the detailed operations in a refinery and petrochemical complex under planning

Keywords: planning     scheduling     refinery-petrochemical     convolutional neural network     heuristic algorithm    

Integrated transmission and generation planning model in a deregulated environment

Enrique B. CEDE?O, Sant ARORA

Frontiers in Energy 2013, Volume 7, Issue 2,   Pages 182-190 doi: 10.1007/s11708-013-0256-8

Abstract: ., planning for generation and transmission capacities is decentralized.There is, however, still need for the long term integrated planning of generation and transmission capacitiesThis paper presents a model for integrating generation and transmission expansion planning to identifyThe argument for an integrated model is supported using evidence from integrated planning efforts inThe test results show the potential cost saving from integrated planning.

Keywords: integrated planning     indicative plans     power generation     transmission     deregulation    

Optimization of multi-objective integrated process planning and scheduling problem using a priority based

Muhammad Farhan AUSAF,Liang GAO,Xinyu LI

Frontiers of Mechanical Engineering 2015, Volume 10, Issue 4,   Pages 392-404 doi: 10.1007/s11465-015-0353-y

Abstract: increasing the overall performance of modern manufacturing systems, effective integration of process planningOwing to the complexity of handling process planning and scheduling simultaneously, most of the researchwork has been limited to solving the integrated process planning and scheduling (IPPS) problem for aAs there are many conflicting objectives when dealing with process planning and scheduling, real world

Keywords: integrated process planning and scheduling (IPPS)     dispatching rules     priority based optimization algorithm    

Computer aided process planning system based on workflow technology and integrated bill of material tree

LU Chun-guang, MENG Li-li

Frontiers of Mechanical Engineering 2006, Volume 1, Issue 3,   Pages 305-312 doi: 10.1007/s11465-006-0039-6

Abstract: procedure of process design and management of process data for product life cycle in Computer Aided Process PlanningTo solve these questions, application of workflow technology in CAPP system based on web-integrated Billof Material (BOM) tree is discussed, and a concept of integrated BOM tree was brought forward.Taking integrated BOM as the thread, CAPP systematic technological process is analyzed.information encoding, organization node design of integrated BOM tree, transformation from Engineering

Keywords: PBOM     systematic technological     implementation technology     management     workflow technology    

Airline planning and scheduling: Models and solution methodologies

Lei ZHOU, Zhe LIANG, Chun-An CHOU, Wanpracha Art CHAOVALITWONGSE

Frontiers of Engineering Management 2020, Volume 7, Issue 1,   Pages 1-26 doi: 10.1007/s42524-020-0093-5

Abstract: We review the literature on airline planning and scheduling and focus on mathematical formulations andformulation, widely used solution approaches, and important extensions are presented for each problem and integrated

Keywords: airline planning     fleet assignment problem     aircraft routing problem     crew pairing problem     crew rosteringproblem     crew scheduling problem     integrated planning    

An integrated assessment method of urban drainage system: A case study in Shenzhen City, China

DONG Xin, ZENG Siyu, CHEN Jining, ZHAO Dongquan

Frontiers of Environmental Science & Engineering 2008, Volume 2, Issue 2,   Pages 150-156 doi: 10.1007/s11783-008-0014-z

Abstract: This requires that the integrated assessment for the planning and operation of the urban drainage systemTo evaluate the urban drainage system, an integrated assessment methodology based on the analytic hierarchyprocess (AHP), integrated simulation, and fuzzy assessment is established.Management Model (SWMM), a simple wastewater treatment plant model, and a surface water quality model, an integratedthe water environ mental impact, ecological impact, technological feasibility, and economic cost, the integrated

Keywords: integrated assessment     hierarchy process     centralized     technological feasibility     planning    

Analysis of Sydney’s recycled water schemes

Zhuo CHEN, Huu Hao NGO, Wenshan GUO, Xiaochang WANG

Frontiers of Environmental Science & Engineering 2013, Volume 7, Issue 4,   Pages 608-615 doi: 10.1007/s11783-012-0468-x

Abstract: prospects of further expansion and exploration of current and new end uses were identified toward the integratedwater planning and management.

Keywords: recycled water schemes     end use     water quality     public attitudes     integrated water planning and management    

Research on Development of Mass Customization Service Mode Integrated with Artificial Intelligent Technology

Liu Yufei, Kong Dejing, Qu Xianming

Strategic Study of CAE 2018, Volume 20, Issue 4,   Pages 118-121 doi: 10.15302/J-SSCAE-2018.04.019

Abstract: Suggestions are proposed for popularizing the mass customization service mode integrated with artificial

Keywords: artificial intelligence     development planning     mass customization     service mode    

Family planning technical services in China

Shang-Chun WU

Frontiers of Medicine 2010, Volume 4, Issue 3,   Pages 285-289 doi: 10.1007/s11684-010-0097-3

Abstract: Family planning is a basic state policy in China.Technical services are the key measures for implementing the family planning policy.contraceptive methods based on the government’s commitment, China has established countrywide family planning

Keywords: family planning     contraceptive method     service delivery    

A collaborative approach for urban underground space development toward sustainable development goals: Critical dimensions and future directions

Fang-Le PENG, Yong-Kang QIAO, Soheil SABRI, Behnam ATAZADEH, Abbas RAJABIFARD

Frontiers of Structural and Civil Engineering 2021, Volume 15, Issue 1,   Pages 20-45 doi: 10.1007/s11709-021-0716-x

Abstract: These linkages also manifest that land administration, integrated planning, architectural design, and

Keywords: underground space     Sustainable Development Goals     spatial data infrastructure     underground land administration     integratedplanning    

Development and challenges of planning and scheduling for petroleum and petrochemical production

Fupei LI, Minglei YANG, Wenli DU, Xin DAI

Frontiers of Engineering Management 2020, Volume 7, Issue 3,   Pages 373-383 doi: 10.1007/s42524-020-0123-3

Abstract: Production planning and scheduling are becoming the core of production management, which support theThe optimization of production planning and scheduling is attempted by every refinery because it gainsOperation research with mathematical programming is a conventional approach used to address the planningThis paper introduces the perspective of production planning and scheduling from the development viewpoint

Keywords: planning and scheduling     optimization     modeling    

Ant colony optimization for assembly sequence planning based on parameters optimization

Zunpu HAN, Yong WANG, De TIAN

Frontiers of Mechanical Engineering 2021, Volume 16, Issue 2,   Pages 393-409 doi: 10.1007/s11465-020-0613-3

Abstract: As an important part of product design and manufacturing, assembly sequence planning (ASP) has a considerable

Keywords: assembly sequence planning     ant colony optimization     symbiotic organisms search     parameter optimization    

Offline motion planning and simulation of two-robot welding coordination

Tie ZHANG, Fan OUYANG

Frontiers of Mechanical Engineering 2012, Volume 7, Issue 1,   Pages 81-92 doi: 10.1007/s11465-012-0309-4

Abstract: After that, the non master/slave scheme is chosen for the motion planning, the non master/slave scheme

Keywords: complex curve seam     two robots     coordinated welding     motion planning    

An uncertain energy planning model under carbon taxes

Hongkuan ZANG, Yi XU, Wei LI, Guohe HUANG, Dan LIU

Frontiers of Environmental Science & Engineering 2012, Volume 6, Issue 4,   Pages 549-558 doi: 10.1007/s11783-012-0414-y

Abstract: In this study, an interval fuzzy mixed-integer energy planning model (IFMI-EPM) is developed under consideringThe developed IFMI-EPM incorporates techniques of interval-parameter programming, fuzzy planning andmixed-integer programming within a general energy planning model.

Keywords: energy     carbon tax     planning     uncertainty     fuzzy    

High-efficiency inspecting method for mobile robots based on task planning for heat transfer tubes in

Frontiers of Mechanical Engineering 2023, Volume 18, Issue 2, doi: 10.1007/s11465-022-0741-z

Abstract: Since there are thousands of tubes to be checked, task planning is essential to guarantee the preciseMost in-service robots check the task tubes using row-by-row and column-by-column planning.This method proceeds into three steps: task allocation, base position search, and sequence planning.Lastly, we apply an improved ant colony algorithm for base sequence planning and determine the inspectionWe validated the optimized algorithm by conducting task planning experiments using our robot on a tube

Keywords: steam generator transfer tubes     mobile robot     dexterous structure     task planning     efficient inspection    

Title Author Date Type Operation

Enterprise-wide optimization of integrated planning and scheduling for refinery-petrochemical complex

Journal Article

Integrated transmission and generation planning model in a deregulated environment

Enrique B. CEDE?O, Sant ARORA

Journal Article

Optimization of multi-objective integrated process planning and scheduling problem using a priority based

Muhammad Farhan AUSAF,Liang GAO,Xinyu LI

Journal Article

Computer aided process planning system based on workflow technology and integrated bill of material tree

LU Chun-guang, MENG Li-li

Journal Article

Airline planning and scheduling: Models and solution methodologies

Lei ZHOU, Zhe LIANG, Chun-An CHOU, Wanpracha Art CHAOVALITWONGSE

Journal Article

An integrated assessment method of urban drainage system: A case study in Shenzhen City, China

DONG Xin, ZENG Siyu, CHEN Jining, ZHAO Dongquan

Journal Article

Analysis of Sydney’s recycled water schemes

Zhuo CHEN, Huu Hao NGO, Wenshan GUO, Xiaochang WANG

Journal Article

Research on Development of Mass Customization Service Mode Integrated with Artificial Intelligent Technology

Liu Yufei, Kong Dejing, Qu Xianming

Journal Article

Family planning technical services in China

Shang-Chun WU

Journal Article

A collaborative approach for urban underground space development toward sustainable development goals: Critical dimensions and future directions

Fang-Le PENG, Yong-Kang QIAO, Soheil SABRI, Behnam ATAZADEH, Abbas RAJABIFARD

Journal Article

Development and challenges of planning and scheduling for petroleum and petrochemical production

Fupei LI, Minglei YANG, Wenli DU, Xin DAI

Journal Article

Ant colony optimization for assembly sequence planning based on parameters optimization

Zunpu HAN, Yong WANG, De TIAN

Journal Article

Offline motion planning and simulation of two-robot welding coordination

Tie ZHANG, Fan OUYANG

Journal Article

An uncertain energy planning model under carbon taxes

Hongkuan ZANG, Yi XU, Wei LI, Guohe HUANG, Dan LIU

Journal Article

High-efficiency inspecting method for mobile robots based on task planning for heat transfer tubes in

Journal Article